QSHE leadership across a live CapEx programme
Embedded as QSHE lead across a multi-workstream capital expenditure programme at a large manufacturing and brewing site, coordinating safety supervisors across concurrent contractor crews. Scope covered RAMS review, permit-to-work governance, toolbox talk content and management-of-change documentation for electrical and mechanical works.
Delivered a site-specific Pre-Energisation Checklist aligned to the client's electrical safety standard, with arc flash PPE categories and formal signatory blocks built in — closing a gap between engineering handover and safe energisation.
Standardised pre-energisation sign-off adopted as the default control for CapEx electrical handover across the workstream.